A complete turnkey proposal should make the finished outcome, price basis and handover obligations understandable before work starts. “All inclusive” is not a substitute for a coordinated scope.
Design and approvals
List surveys, concept design, architecture, structure, MEP, interiors if included, authority submissions and revision limits. Identify approvals controlled by the contractor, those dependent on the owner and statutory fees excluded from the price.
Construction, MEP and finishes
Attach drawings and a specification schedule covering structure, masonry, waterproofing, doors, windows, flooring, painting, plumbing, electrical, fire/life safety and external works. State brands or performance standards, acceptable alternatives, samples and mock-up approvals.
Procurement and cost control
The proposal should include the contract sum, taxes, escalation basis, allowances, payment milestones, retention, procurement schedule and excluded works. Changes need a written request, priced time-and-cost effect and approval before execution.
Ready to turn the checklist into a project-specific conversation?
Quality inspections and reporting
Agree inspection and test plans for reinforcement, concrete, waterproofing, pressure tests, electrical tests, finishes and commissioning. Record non-conformities and closure. Progress reports should show schedule status, completed work, next steps, procurement, decisions and photographs tied to a date.
Handover checklist
- Approved and as-built drawings
- Test and commissioning certificates
- Equipment manuals, warranties and vendor contacts
- Statutory completion records applicable to the scope
- Snag list and closure record
- Keys, access credentials, meter and asset schedules
- Final account and change register
- Defect-liability period, response times and security release conditions
Compare proposals against one common scope. A lower price built on more exclusions is not necessarily better cost control.