The labels architect, PMC, contractor and turnkey provider describe different scopes. Owners should choose the model by the accountability and control they need—not by title alone.
Five common delivery models
- Design-only architect: develops the design and drawings; the owner appoints and coordinates contractors. Design accountability is clearer, but owner involvement is high.
- Design-and-manage: the architect designs and administers selected construction activities. Confirm whether cost, schedule and site supervision are advisory or contractual duties.
- Project Management Consultant: plans, coordinates, reports and controls on the owner’s behalf while trade contracts remain separate. It offers visibility but does not automatically transfer construction risk.
- General contractor: builds from an owner-provided design for an agreed scope. Design gaps and coordination interfaces can remain with the owner.
- Turnkey contractor: takes integrated responsibility for design and construction to a defined handover. Accountability is concentrated, while late owner changes can be costly.
Ready to turn the checklist into a project-specific conversation?
Compare accountability and cost control
Ask who owns design coordination, quantity risk, procurement, approvals, schedule recovery, testing and defects. Open-book packages can improve visibility; lump-sum packages can improve price certainty only when the scope is complete. Every model needs a change-control mechanism.
Match the model to owner capacity
An experienced owner with time and a trusted consultant team may prefer separate design and construction contracts. An owner seeking one accountable counterparty may prefer turnkey, provided the employer’s requirements, specifications and review rights are precise. A PMC is valuable when the owner wants independent control across several contracts.
Before appointment, request a responsibility matrix, deliverables list, programme, fee or price basis, exclusions, decision calendar and reporting sample. Those documents reveal more than the service label.
Next step
Request a Project-Control Consultation
Your enquiry will include this article and the relevant enquiry type, so the right team can respond with context.